How Much Does a Single-Storey Extension Cost in the UK? (2026 Guide)

by | Aug 25, 2025 | Extensions

In 2026, a single-storey extension in England and Wales typically costs £1,800 to £3,500+ per square metre for the building work. That puts a 20m² rear extension at roughly £36,000 to £70,000+ before VAT, professional fees and fit-out. Where you land inside that range comes down to three things: your postcode, your specification, and how complicated the site is.

Below is a plain breakdown of what the money actually goes on, what most quotes leave out, and how long the job takes once it starts.

Single-storey extension cost at a glance (2026)

  • Build cost: £1,800–£3,500+ per m² depending on quality and location
  • Typical 20m² extension: £36,000–£70,000+ for the build alone
  • Add on top: drawings, structural calculations, council fees, building control, party wall costs, kitchen and decorating
  • Contingency: 10–20% of the build cost
  • VAT: 20% on most domestic building work — check whether a quote includes it
  • Time on site: around 8–12 weeks for a straightforward single-storey rear extension

Cost per square metre by build quality

Build quality Cost per m² 20m² extension
Basic build £1,800–£2,200 £36,000–£44,000
Mid-range finish £2,200–£2,800 £44,000–£56,000
High-end £2,800–£3,500+ £56,000–£70,000+

Basic means a simple rectangular box, standard windows, plasterboard and a plain finish. Mid-range is where most family kitchen extensions sit: decent glazing, underfloor heating, a proper roof detail. High-end is structural glazing, sliding doors, flush thresholds, feature rooflights and a joinery-led fit-out.

Cost by extension size

Extension size Typical build cost What it gives you
15m² £27,000–£52,500 Modest rear infill or larger kitchen
20m² £36,000–£70,000 Kitchen-diner across the rear of the house
25m² £45,000–£87,500 Open-plan kitchen, dining and seating
30m² £54,000–£105,000 Kitchen-diner plus utility or WC
40m² £72,000–£140,000 Wrap-around or full-width rear

Per square metre, bigger is usually better value. The fixed costs — getting a digger in, the steel, the drainage connection, scaffolding, the welfare unit — barely change between 15m² and 25m², so they are spread over more floor area.

Regional price variations

Region Mid-range cost per m² (2026)
London & South East £2,800–£3,800
Midlands & East of England £2,200–£2,800
North of England £1,800–£2,400
Wales £1,800–£2,400

London and the South East typically run 20–30% above the national average — higher labour rates, tighter sites, restricted parking and longer material deliveries all feed into the quote.

What a builder’s quote is actually made of

Most quotes arrive as one number with a short paragraph under it, which makes two quotes impossible to compare. This is the order the work happens in, and what sits inside each stage:

  1. Site set-up and groundwork. Fencing off, skips, scaffolding, a welfare arrangement, digging and concreting the foundations, and connecting or diverting drainage.
  2. Shell. Blockwork and facing brick, the steel beam into the existing house, the roof structure and its covering.
  3. Openings. Windows, external doors and rooflights. This is the most variable line in the whole quote, and the one that moves a job from mid-range to high-end.
  4. First fix. Electrics, plumbing, underfloor heating pipework, insulation and the floor build-up.
  5. Plastering and screed. Then drying time, which is dead time on site.
  6. Second fix and finishes. Sockets and switches, radiators or manifolds, skirting, internal doors, decoration.
  7. Breaking through. Opening up into the existing house and making good — the stage homeowners most often assume is included when it is not.

Some of those stages barely change with size: site set-up, scaffolding, drainage and the steel cost much the same for 15m² as for 25m². The rest scale with floor area. That is the whole reason the cost per m² falls as the extension gets bigger.

Before you compare quotes, check three lines are written down in all of them: the exact glazing specification, what happens to the drains, and whether breaking through and making good is priced. If those three differ, the headline numbers are not comparable.

Worked example: a 20m² mid-range kitchen extension

A 20m² rear extension on a semi-detached house outside London, mid-range specification, bi-fold doors, two rooflights and underfloor heating:

  • Build cost (£2,200–£2,800 per m²): £44,000–£56,000
  • Structural engineer’s calculations: £700–£2,000
  • Council application fee (England): £548 for a householder planning application, or £274 for a lawful development certificate for proposed works
  • Building control: set by your council or an approved inspector — check their published charges
  • Contingency (10–20% of build): £4,400–£11,200
  • VAT: 20%, added by VAT-registered builders

Realistic total before VAT and kitchen: roughly £49,000–£70,000. Add the kitchen, flooring and decorating separately — those are the numbers homeowners most often forget until the shell is up.

What else to budget for beyond the builder’s quote

The build cost is not the project cost. Budget for:

  • Planning and building regulations drawings — the set your builder prices from and your council approves
  • Structural calculations — £700–£2,000, needed wherever you remove a wall or span an opening
  • Council application fee — in England a householder application costs £548, and a lawful development certificate for proposed works is half that, £274. Fees are set separately in Wales, so check your council’s published fee scale. (A revised fee scale for England has been proposed for December 2026 but is subject to parliamentary approval, so confirm the figure on the day you apply.)
  • Building control charges — separate from the planning fee, set by each council or your approved inspector
  • Party wall award — if you build up to or along a shared boundary and a neighbour dissents, you will need surveyors, and you pay
  • Kitchen, flooring, decorating — usually excluded from the builder’s price unless you have asked for it in writing
  • Contingency — 10–20%. Drains in the wrong place and poor ground are the two classic surprises
  • VAT — 20% on most domestic work. Always ask whether a quote is inclusive

How long does a single-storey extension take?

The Federation of Master Builders puts the average single-storey rear extension at around 8–12 weeks on site. Add a kitchen and internal alterations and it can stretch towards 16 weeks.

Door to door is longer. A realistic sequence is: survey and drawings, then eight weeks for a council decision on a planning or lawful development certificate application, then tendering and a builder’s lead-in time, then the build. Six months from first call to finished room is normal, and the paperwork end of that is where people lose time they did not plan for.

What pushes a single-storey extension’s cost up, or down

Up

  • Large sliding or structural glazing, and flush thresholds
  • Drains, manholes or a sewer under the footprint
  • Poor ground, trees nearby, or deep foundations
  • Steelwork for a wide opening into the existing house
  • Awkward access — no side gate means everything goes through the house
  • A complicated roof shape or multiple changes of level

Down

  • A simple rectangle on good ground
  • Standard windows and doors in standard sizes
  • Keeping the existing kitchen or bathroom layout where the services already run
  • A flat roof with rooflights rather than a pitched roof with valleys

Do you need planning permission for a single-storey extension?

Often not — many single-storey rear extensions fall under permitted development. The limits are close in England and Wales, but the escape route for a deeper extension exists only in England. Our guide to whether you need planning permission for an extension goes through this in full.

England

  • Up to 4 metres beyond the rear wall of the original house for a detached house, 3 metres for any other house
  • Maximum height 4 metres
  • Eaves no higher than 3 metres within 2 metres of a boundary
  • No more than half the land around the original house may be covered by extensions and outbuildings
  • Deeper extensions — up to 8 metres detached, 6 metres for any other house — are possible under the larger home extension prior approval scheme, which includes a neighbour consultation. That larger scheme alone is unavailable on article 2(3) designated land (conservation areas, National Parks, the Broads, National Landscapes and World Heritage Sites) and on Sites of Special Scientific Interest. An ordinary 3 or 4 metre single-storey rear extension is still permitted development in a conservation area

Wales

  • Up to 4 metres beyond the rear wall of the original house for a detached house, 3 metres for any other house — the same split as England, so most terraced and semi-detached homes have 3 metres, not 4
  • Maximum height 4 metres, and within 2 metres of a boundary the eaves are limited to 3 metres
  • No more than half the land around the original house may be covered
  • There is no larger home extension prior approval scheme in Wales — go beyond the limits and it is a full planning application

Permitted development rights are also restricted or removed on listed buildings and on some newer estates where a planning condition has taken them away. If you are building under permitted development, a lawful development certificate is worth having — it is the written proof a future buyer’s solicitor will ask for. Building regulations approval is always needed; permitted development is not an exemption from that.

How to keep the cost down

  1. Keep the shape simple. A rectangle with a single roof. Every corner, step and roof junction costs money twice — once in labour, once in detailing.
  2. Stay off the drains. Moving a manhole or building over a sewer adds cost and a build-over agreement.
  3. Concentrate the glazing budget in one area. One good set of doors beats three mediocre openings.
  4. Finalise the drawings before you tender. Changes on paper cost nothing. Changes on site cost thousands.
  5. Price with three builders off identical drawings. Quotes are only comparable if everyone is pricing the same thing.
  6. Fit out in phases if the budget requires. Get the shell watertight and finished properly; the kitchen and landscaping can follow later.

Try it on your own floorplan

Ranges only get you so far — your own layout is what decides the number. Our free extension planner lets you sketch an extension straight onto a photo of your existing floorplan, set the scale, and see the floor area and a build cost range adjusted for your postcode and finish level. No sign-up, and your plan stays on your device.

Single-storey extension cost: quick answers

How much does a single-storey extension cost per m²?

£1,800–£3,500+ per m² in 2026 across England and Wales. Basic specification sits at the bottom of that range, high-end glazing and joinery at the top, and London and the South East run above it.

How much is a 20m² single-storey extension?

£36,000–£70,000 to build, before VAT, professional fees and a contingency.

How much does a 4m x 5m extension cost?

That is 20m², so £36,000–£70,000 for the build. A 3m x 3m extension is 9m², which works out at roughly £16,200–£31,500 on the same per-m² range — but the smaller it gets, the higher the cost per m², because site set-up, scaffolding and drainage cost much the same either way.

Do these figures include VAT and fees?

No. They are build costs only. Add 20% VAT on standard-rated work, plus drawings, structural calculations, the council application fee, building control charges and any party wall costs — and keep 10–20% back as contingency.

Can I build a 6 metre extension without planning permission?

In England, yes in principle: a single-storey rear extension of up to 6 metres, or 8 metres for a detached house, can go ahead under the larger home extension prior approval scheme, which includes a neighbour consultation and is not available on article 2(3) designated land. There is no equivalent scheme in Wales, where anything beyond 3 metres — 4 metres for a detached house — needs a full planning application.

Why does London cost so much more?

Labour rates and access. Sites are tighter, parking and deliveries are restricted, and skips and scaffolding cost more to get in and out. Together that typically puts London and the South East 20–30% above the national average.

Is a two-storey extension cheaper per square metre?

Often, yes. The foundations and the roof are the expensive bits, and a second storey reuses both, so the extra floor area costs less per m² than the first. The total bill is still higher. See our two-storey extension cost guide for £1,800–£3,000+ per m².

Do I need building regulations approval even without planning permission?

Yes. Permitted development only removes the need for planning permission. Building regulations apply to the extension regardless, covering structure, insulation, drainage, fire safety and ventilation.

Why do builders’ quotes vary so much?

Usually because they are not pricing the same job. One has allowed for the steel and the drain diversion, another has not. Identical drawings and a written specification are the only way to compare like with like.

Does an extension need a structural engineer?

If you are removing part of a wall, spanning a wide opening or supporting anything above, yes — building control will want the calculations. Budget £700–£2,000.

Should I budget for a party wall surveyor?

If you are excavating near or building up to a shared boundary, you must serve notice on your neighbour. If they agree in writing, there is nothing more to pay. If they dissent, surveyors are appointed and the cost usually falls to you.

Fixed-price drawings for your single-storey extension

We draw extensions for homeowners across England and Wales. A 3D scan of your home gives us accurate existing drawings to work from, so the proposal is right first time and your builder prices from something real. Our planning and LDC approval rate is 94%.

Your price is fixed and confirmed in writing before any work starts — see what each package includes on our pricing page, or book a free intro call and we will tell you honestly whether your project needs planning permission at all.

Related services