Drawing up plans for a home project in the UK usually costs between £1,000 and £5,000+, depending on the size of the job and whether you need planning drawings only or a full set that includes building regulations.
Typical architect drawing costs at a glance
| Project type | Planning drawings | Full plans (planning + building regs) |
|---|---|---|
| Single-storey extension | £1,000–£2,500 | £2,500–£5,000 |
| Loft conversion | £1,200–£2,500 | £2,500–£4,500 |
| Two-storey extension | £1,500–£3,000 | £4,000–£6,000 |
| New build home | £2,500–£5,000+ | £4,000–£8,000+ |
On top of the drawings you also need to budget for your council’s planning application fee (typically £300–£700) and, where steels or new openings are involved, a structural engineer (typically £700–£2,000).
Fixed price vs percentage of build cost
There are three common ways of charging, and the one you pick matters as much as the headline number.
- Percentage of build cost — traditional architects charge around 7–15% of the total build cost, so the fee rises as the build gets more expensive.
- Hourly rate — commonly £50–£100 per hour. Fine for a small piece of advice, hard to budget across a whole project.
- Fixed price — one agreed price for a defined set of drawings, confirmed before work starts.
| Traditional architect | Arkiplan | |
|---|---|---|
| How charged | Often 7–15% of build cost, or £50–£100/hr | One fixed price, confirmed in writing |
| Cost certainty | Can move as build cost or hours change | Known to the pound, up front |
| Payment | Usually staged fees | Pay up front or 3 monthly instalments |
| Typical saving | — | £2,284 saved on average vs traditional |
What affects the cost of your plans
- Size and complexity — more floor area and more structural change mean more drawing time.
- Which drawings you need — planning drawings show the design; building regulations drawings add the technical detail.
- Extra specialists — a structural engineer, and sometimes a drainage or soil survey, are charged separately.
- Service level — drawings only costs less than drawings plus submitting the application and handling the council’s questions.
Planning drawings vs building regulations drawings
Planning drawings are the scaled drawings your application needs: floor plans, elevations and a site plan showing what the building will look like.
Building regulations drawings show how it goes together — construction detail, insulation, structure, drainage and fire safety. They take longer and cost more than planning drawings alone, and your builder prices from them.
Do you actually need an architect?
You don’t legally have to use a chartered architect. For most home extensions and loft conversions, an experienced architectural designer or technologist can produce everything you need. A chartered architect earns their fee on one-off new builds, listed buildings and unusual design problems.
How to keep the cost down
- Be clear on scope early, before anyone starts drawing.
- Check whether the project falls under permitted development first.
- Ask for a fixed price, in writing.
- Get the drawings right once — a refused application you have to redraw is the expensive route.
What it costs to start with Arkiplan
We are a remote-first residential practice working with homeowners across England and Wales. In 18 years we have helped 2,000+ homes get permission, with a 94% planning and LDC approval rate, and our clients pay £2,284 less on drawings, on average, than with a traditional architect. There are 570+ reviews behind that, at 4.7 stars — you can read them on our reviews page.
Your fixed price is confirmed in your proposal after a Deep Dive with Dave, our founder: a one-to-one video meeting where he tells you whether what you want is realistic, roughly what it will cost to build and which planning route it needs. What you pay for the Deep Dive is credited against your design package if you go ahead. Not satisfied with your Deep Dive? Tell us within 7 days of the meeting and we’ll refund the amount you paid in full, no questions asked. You can pay in full or in 3 instalments, with no credit checks.
If you would rather have numbers before you talk to anyone, the free tools on our how it works page will estimate your build cost, check your project feasibility and generate a renovation report for your address — no call needed. The three fixed-price packages are set out on our pricing page, and if you have a question first, you can book a 10-minute intro call.
Frequently asked questions
How much does it cost to draw plans for an extension?
Planning drawings for a single-storey extension typically cost £1,000–£2,500. A full set including building regulations drawings is usually £2,500–£5,000. Our house extension plans page sets out what is included.
Are planning drawings cheaper than building regulations drawings?
Yes. Planning drawings show the design only; building regulations drawings add the technical construction detail, so they take longer to produce.
Do I have to pay a percentage of my build cost?
No. Many services, including ours, work to a fixed price agreed in writing beforehand.
What other costs should I budget for?
Your council’s application fee (typically £300–£700) and a structural engineer (£700–£2,000) where steels or new openings are involved. Building control is charged separately again.
Can I get a price before committing?
Yes. Your fixed price is confirmed in your proposal after your Deep Dive, and if the Deep Dive isn’t right for you, you have 7 days to ask for a full refund, no questions asked.
Final thoughts
Drawing plans in 2026 typically costs £1,000–£5,000+, with the size of the job and the type of drawings doing most of the work in that range. The bigger decision is how you’re charged: a percentage or hourly fee can move, while a fixed price tells you exactly what you’ll pay before work begins.
How to get your plans drawn
Start by explaining what you want to change, then agree the drawings and services your project needs before committing to a design package. To discuss your project and the next steps, get your plans drawn with Arkiplan, starting with a Deep Dive.